PLAYBOOK
How a school LMS or ERP adds governed, curriculum-aligned lesson-plan generation as an API — so teachers get a strong first draft, not a blank page.
CrazyGoldFish
IN SHORT
Lesson-plan generation plugs into your LMS or ERP as an API: you send the grade, subject, topic, and any board or curriculum constraints; you get back a structured, curriculum-aligned plan a teacher can edit and approve. The integration is roughly a day. The design points that matter are governance (curriculum alignment, teacher approval) and storing the plan as structured data your platform can reuse, not just display.
// WHAT.YOU'LL.DO
CHECKGet API credentials and confirm the inputs your platform will pass — grade, subject, topic, board/curriculum, duration.
WHYWhich constraints are mandatory in your context (e.g. NEP/NCERT alignment).
CHECKPOST the inputs and receive a structured lesson plan — objectives, activities, materials, assessment.
WHYSynchronous (teacher waits a moment) vs queued.
CHECKMap the response into your schema so the plan is reusable, searchable, and linkable to the rest of the teacher's workflow.
WHYWhich fields you index now. Storing structure, not just text, is what lets you build on it later.
CHECKPresent the generated plan for teacher edit and approval before it's official, logged.
WHYYour approval states. The plan is a strong first draft under teacher authority, not an auto-published artefact.
CHECKConstrain generation to your curriculum and board, and flag anything off-pattern for review.
WHYYour guardrails. Governed generation is what makes the output trustworthy at scale.
// ILLUSTRATIVE.SHAPE
Illustrative shape. See the API docs at /docs for the exact endpoints and schema.
// CHECKLIST
KEEP READING
// COMMON.QUESTIONS
Does this replace the teacher's planning?
No. It gives a strong, curriculum-aligned first draft the teacher edits and approves. The teacher stays in control; the API removes the blank-page work.
How long does the integration take?
About a day for a first integration: authenticate, call the endpoint, map the structured response into your schema, and wire the teacher approval step.
Is the output curriculum-aligned?
Yes — generation is constrained to the grade, subject, board, and curriculum you pass, and off-pattern output can be flagged for review.